The correct installation of the box-type transformer is the key to the correct use of the equipment in the subsequent process. Following the operation instructions can avoid vague failures due to improper installation during use, and reduce the frequency of downtime for maintenance.


1、The box transformer is mainly composed of natural wind and circulating cooling. Therefore, there should be no illegal stacking around it, especially the transformer room door should not be blocked, and the shutters should be regularly removed for ventilation and the attachments on the sub-holes to ensure that all electrical equipment does not exceed the allowable temperature.

2、The floor of the box-type substation should be placed in a higher place, not in a low-lying place, so as to avoid rainwater pouring into the box and affecting the operation of the equipment.

3、Zinc oxide arresters should be installed in the high-voltage distribution room of box-type transformers, and the installation method should be convenient for testing and disassembly and replacement.

4、The box door of the box-type substation should be opened outward, and there should be handles, secret doors and locks, and the secret doors and locks should be rust-proof

5、The noise level of the box-type substation shall not be greater than the specified noise level of the transformer. Regardless of whether the box shell is made of metal or non-metallic materials, the metal frame of the box body should be well grounded, with grounding terminals, and marked with a grounding symbol

6、

The transformer room should be dominated by natural ventilation, and the relationship between the temperature in the box and the output of the transformer should be given. The transformer room can be equipped with room temperature monitoring devices and self-starting ventilation and cooling devices as required to ensure that the transformer is under the specified environmental conditions.

run at full capacity. The transformer should be accessible from the top of the box or from the side doors.

7、The grounding and neutral line of the box-type substation share a grounding grid. The grounding grid is generally grounded at the four corners of the foundation, and then connected into one. The box-type substation and the grounding grid need to have two reliable connections. During the installation process of the box-type substation, attention should be paid to selecting the appropriate location and avoiding damage to the equipment caused by the external environment, which can prolong its service life, improve work efficiency, and bring better benefits to the enterprise.




Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 日本aⅴ亚洲精品中文乱码| 国产精品99久久99久久久不卡| av无码午夜福利一区二区三区| 蜜桃成人无码区免费视频网站 | 国产日批| 最新版天堂资源中文官网 | 亚洲无码网站| 成人AV毛片| 国产7色在线 | 国产| 国产新婚夫妇叫床声不断| 中文乱码字慕人妻熟女人妻| 亚洲 国产 韩国 欧美 在线| 国产精品乱| 亚洲精品国偷拍| 中文字幕欧美人妻精品一区蜜臀 | 亚洲电影a| av狼友| 爱爱网av| 久久婷婷五月综合成人d啪| 国产精品人人做人人爽| 中文乱码字慕人妻熟女人妻| 西城区| av尤物在线| 亚洲欧美日本韩国| 日韩一区二区三| 中国少妇女裸体bbw| 亚洲熟妇无码av不卡在线| 亚洲人成网站18禁止人| 天堂网在线最新版www中文网| 欧美一区二区三区喷汁尤物| 女av在线| 久久人人爽人人爽人人爽| 欧美日韩一区二区成人午夜电影| 夜先锋av资源网站| 性视频网址| 亚洲二区av| 国产97人人超碰cao蜜芽prom| 亚洲天堂男人影院| 广平县| 国产黑丝袜在线观看视频| gay2022男同精油裸推|