国产综合一区二区三区av,亚洲一区二区三区在线播放无码,亚洲国产熟女一区二区三区,男女性高爱潮久久,免费人成网上在线观看网址,色窝窝无码一区二区三区色欲,精品无码国产一区二区三区av,无码少妇一区二区三区免费
Price composition of electrical equipment
font size:SmallMiddleBig

Price composition of electrical equipment

1、Primary and secondary components price;

2、The price of auxiliary materials, including: secondary wire, terminal, wire nose, wire clip, bobbin, number tube, character code, cable tie, standard parts, etc.;

3、The price of the busbar, the amount of the busbar is budgeted according to the one-time plan diagram;

4、The shell price should be quoted by the dedicated shell manufacturer according to the one-time plan; box-type substations and non-standard boxes (cabinets) are calculated according to the size of the box.

5、Packaging and shipping costs;

6、Comprehensive expenses of the enterprise, including management fees, labor wages, taxes and profits, etc.;

7、Wanshang Power tells you the quotation process and matters needing attention

1、Digest the drawings:

According to the drawings provided by the user, first check the catalog of drawings, and then assign and classify them. Understand the design intent of the project in accordance with the design instructions and technical requirements of the drawings (if there are bidding documents, the technical requirements of the bidding documents), consider the price required for the calculation of the variable scheme, and pay attention to the floor plan (floor plan The above reflects whether there is a busbar bridge and the length of the busbar bridge between the cabinets).

2、Related Notes:

①、As far as high-voltage cabinets are concerned, in order to meet the five-proof requirements, the incoming cabinet needs to be equipped with a live display (mandatory type: DXN-10, 24/35Q) and an electromagnetic lock, and the outgoing cabinet needs to be equipped with a live display (prompt type: DXN-10/35T ) and grounding switch interlocking device.

②、When the two-way power supply is in, consider the self-switching device, and consider the electrical and mechanical interlocking device (three-in-two) between the two-way power supply and the bus tie.

③、Sulfur hexafluoride ring main unit and KYN28-12 central cabinet generally need to be equipped with temperature and humidity controller and heater.

④、If the interphase and interphase-to-ground distances cannot meet the electrification requirements, busbar vulcanization treatment or special-shaped busbars or heat-shrinkable sleeves for busbar sleeves should be used, and the joints should also be covered with an insulating cover.





Updated:2022-07-02 | Back to list
WeChat
WeChat
主站蜘蛛池模板: 伊人久久影院| 欧美激性欧美激情在线| 人成午夜免费大片| 国产美女在线精品免费观看| 福利视频导航网| 欧美极品视频在线| 国产精品视频免费一区二区| 一区二区亚洲精品| 精品一区二区三区在线播放视频 | 欧美一区二区三区啪啪| 3P在线看| 亚洲色情在线播放| 免费大片黄国产在线观看| 西西人体大胆4444www| 亚洲第一色| 国产精品白浆在线观看无码专区| 国产精品久久久久久久妇| 潘金莲a级片| av二区在线| 日韩精品人妻系列无码专区免费| 最近中文字幕av在线| 亚洲色涩| 亚洲一区二区三区丝袜| 无码免费一区二区三区| 丝袜足控一区二区三区| 亚洲午夜2025| 中文字幕在线观看www| 亚洲综合色无码| 老司机亚洲精品| 精品无码一区二区三区不卡| 国产精品1区| av黄色网址| 手机看片日韩| 亚洲最大av网站在线观看| 彩票| 中文字幕三区| 26uuu亚洲电影最新地址| 中文字幕乱码人妻二区三区| 超碰免费在线| 亚洲.无码.制服.日韩.中文字幕| 五十路熟妇无码专区|